VRF & VRV Systems Services
-
40 LECTURES
-
120 HOURS
-
8 WEEKS
Services of VRF & VRV systems - all interested adults who wish to acquire specific knowledge/skills in a short period of time and be employed in the mentioned direction can study at the professional training program. Teaching at the professional training program is carried out by highly qualified specialists using the work-based teaching methodology. The program envisages a connection between learning outcomes and labor
market requirements; Achieving the practical part of the results of the professional training program is carried out both in the C learning space and in the practical working environment, which is important for the development of the necessary skills for the trainees. The duration of the program is 8 weeks, 15 hours per week (120 contact hours in total). In the process of implementing the program, interactive lecture and practical teaching methods
will be used, and in the evaluation, written survey, practical task with observation and practical task - product as evidence.
After achieving the learning outcomes provided for in the professional training program:
The trainee will receive a certificate recognized by the state, with an appendix, which records the knowledge and skills achieved by the person within the program.
The person will be able to pass the ,,Refrigerant Equipment Service Technicians Test'' developed by the Center for Environmental Protection Information and Education .
After all of the above, the person is entitled to be employed as an installer of air conditioning systems and a technical service specialist .
1. 1. Georgian legislation:
- Law of Georgia Environmental Protection
- Law of Georgia ,,On Ambient Air Protection";
- Law of Georgia ,,Code of Administrative Offenses of Georgia"'';
- Resolution of the Government of Georgia No. 304;
- Georgian Standard SST 70-2013: "Requirements for the safety and environmental protection of refrigeration systems and heat pumps"
- Monreal Protocol "About ozone depleting substances";
- The association agreement, on the one hand, Georgia, on the other hand, membership of the European Union and the European Atomic Energy Union between the states
- Annex XXVII - Climate Action
- Law on Energy Efficiency
1. 2. Basics of air conditioning
- purpose of air conditioning;
- Comfortable conditions for a person's thermal sensation;
- Human thermal balance;
- Calculation parameters of indoor air;
- Environmental climate characteristics and reporting parameters;
1. 3. Heat flow and heat loss
- Basic principles.
1. 4. Review and analysis of a typical project of heating-conditioning and ventilation systems of buildings :
- Project solutions;
- Conventional Signs;
1. 2.1. Basics of air conditioning
- Energy and forms of energy;
- N1 law of thermodynamics;
- N2 law of thermodynamics;
- Energy transfer (heat, work);
- Heat transfer: conduction, radiation, convection;
- Aggregate state of matter: solid, liquid and gas;
- Mass and weight;
- Heat capacity, heat capacity;
- Latent and sensitive heat;
- System and system properties;
- Temperature, absolute temperature
- Atmospheric pressure, manometric pressure
1. 2.2 Refrigerator cars and hot pumps Main components:
- Compressor, condenser, evaporator, throttle (EXV, TXV, Capillary tube); receiver; Electronic control boards.
- Purpose and principle of operation of the main parts
1. 2.3 Principles of operation of refrigerating machines and heat pumps;
- What is power, its measurement units
- Efficiency
- Process and cycle
1. 2.4 Auxiliary components of refrigerating machines and heat pumps;
- Auxiliary parts: 4-stroke valve, silencer, solenoid valve, liquid separator, electric. Condenser.
- Split type conditioner
1. 2.5 Refrigerants
- Thermodynamic properties of refrigerants;
- Importance of oil use and compatibility with refrigerant;
- Refrigerant collection;
- Refrigerants with ozone depleting and global warming potential;
- Alternative, natural and synthetic refrigerants.
1. 2.6 Air conditioning systems impact on the environment:
- Enthalpy
- Pressure enthalpy diagram
- Reverse carnot cycle
- Isotherma, isobar, isochorda
- Critical point, saturated liquid line, saturated vapor line, superheating zone, supercooling zone
1. 2.7 Air conditioning system:
- Split type air conditioner;
- Multizone air conditioner;
- VRF & VRV two-pipe system
- VRF & VRV three pipe system
1. 3.1 VRF & VRV System:
- " Refrigerant variable flow " and " refrigerant variable Volume " installation norms and conditions of systems;
1. 3.2 A special computing program (VRF Selection Software)
- A special computing program (VRF Selection Software) , drawing up a technical report of the VRF system, in accordance with the design drawing;
- Determination of installation and consumables;
1. 3.3 Confirmation of learning results 1,2,3
1. 3.4 Air conditioning with the installation of systems related risks and threats, methods of reducing them;
1. 4.1 Electricity:
- Protection of labor safety;
- Electrical safety protection and its technical means;
- Fire prevention measures;
- Effect of current value on damage outcome;
- Single-pole and cross-pole contact with current-carrying parts;
- Protective earthing and earthing;
- Safe electricity for human health;
- The cause of the origin of electricity;
- Symbols of principle and architectural drawings, reading of drawings, their interpretation, meaning of electronic parameters of devices;
- Wohr's law, electrical resistance, conductivity, electric circuit, series and parallel connections, mixed connections;
- Electricity energy and power calculation, permissible cross-sections, working tables, working materials;
- Protection systems, automatic machine classification and working principle;
- Circuit switching devices, relay, principle of operation of magnetic starter, circuit diagrams;
- The working principle of variable asynchronous single-phase and three-phase electrical motors, their diagnosis, arrangement of outputs;
- Star and delta connection schemes;
- Working principle of DC motor;
- Rules for using measuring tools ("multimeter");
1. 4.2 Split type air conditioner:
- Installation and commissioning;
- Installation tools;
- Monitoring and regulation of operating parameters;
1. 5,6 Installation of VRF system:
- Placement and installation of outdoor units;
- Placement and installation of internal units;
- Selection-adjustment of copper pipelines and their distributors;
- Insulation of copper pipelines;
- Methods of connecting copper pipelines - welding and "rolling" connection;
- Importance of dry nitrogen in welding;
- Cleaning of copper pipelines with dry nitrogen;
- Checking the tightness of the system;
- Vacuum drying of the system;
- Drainage system;
- Determining the required amount of refrigerant and adding it to the system;
- Electrical Wiring;
- Heating, cooling and oil return cycle;
1. 7.1 VRF System Commissioning:
- Monitoring of operating parameters;
- Compilation of the commissioning report and transfer to the customer;
1. 7.2 Diagnosis of possible malfunctions of the VRF system and methods of their correction:
1. 8.1 Scheduled maintenance of air conditioning systems and related reporting:
1. 8.2 Confirmation of learning outcomes
Course instructors
Course instructors teaser
-
SUPPORT
Permanent community with teachers and students of the course
-
CERTIFICATE
Certificate upon completion of the course
-
LEVEL
For beginners. You will learn from scratch the skills necessary for a designer
-
About Syllabus
For beginners. You will learn from scratch the skills necessary for a designer